Our Fixed Aluminium Windows are engineered for maximum natural light and a clean, minimal profile, with a non-operable sash sealed permanently into the frame. Manufactured from corrosion-resistant aluminium sections with weather-tight glazing, these windows deliver strong thermal and acoustic performance for commercial, institutional, and industrial buildings.

Designed for maximum daylight and a minimal sightline — combining slim aluminium framing, weather-tight glazing and a fully sealed, non-operable sash.
Fixed Aluminium Windows are built where ventilation isn't required but daylight and a clean façade are — reception areas, stairwells, tall glazing panels, and feature walls. Their sealed construction improves thermal and acoustic performance while keeping maintenance to a minimum.
Standard build data on the left, available glazing and finish options on the right.
| Window Type | Fixed Aluminium Window |
|---|---|
| Construction | Aluminium Frame, Non-Operable Sash |
| Glazing | Single / Double Glazed (As Required) |
| Coating | Powder Coated / Anodized Finish |
| Sealing | EPDM Weather Seals, Structural Glazing |
| Standard Sizes | As Required (Custom Sizes Available) |
| Hardware Included | Glazing Beads, Anchor Fasteners |
| Optional Add-ons | Tinted / Reflective / Laminated Glass |
| Recommended Use | Commercial Buildings, Offices, Hospitals, Facades |
All options manufactured to order. Custom frame shades, glass types and sizes available on request — mention your requirement when requesting a quote.
No, the sash is permanently sealed into the frame. This gives the best weather-tightness and thermal performance, and suits areas that don't need ventilation.
Clear, tinted, reflective and laminated safety glass are available in single or double-glazed configurations depending on your thermal and safety requirement.
Yes. Windows are manufactured as required to fit your specific opening dimensions rather than fixed standard sizes.
Yes, Mitva provides end-to-end delivery — from manufacturing through on-site installation and commissioning.
Lead times depend on quantity, glazing selection, and custom sizing. Share your requirement and our team will confirm a schedule.